Beautiful spaces, made with our SIP panels

Residential 5 bedroom detached house

Location

Bricket Wood, Hertfordshire

}

Construction time

4 weeks (SIPs and structural)

Materials cost

£33,000 (ex VAT)

This project was both designed and supplied by uSIPs. The original building was an outdated bungalow, sitting on a substantially sized plot, in Bricket Wood, Hertfordshire.

The bungalow footprint and foundations were reused, saving a great deal of both time and expense.  The property now has vaulted ceilings and spacious rooms, all constructed using our pre-fabricated SIPs – erected and watertight months quicker than if the client had used more conventional building methods.

6m x 3m at-home gym

Location

Hertfordshire

}

Construction time

2 weeks

Materials cost

£2,900 (ex VAT)

This customer used our SIP kit to build their very own 6m x 3m at-home gym space, which they then clad in cedar wood. The SIP structure itself took just 1 day to build and the total cost for the materials came in at only £2,900 (excluding VAT).

Using our SIP panels for garden rooms means that all openings are pre-formed, cut to size and ready to be assembled on-site. This part of the process can be completed in a matter of hours. Our panels offer the highest level of insulation possible too. 

This 12m x 6.5m Jiu-Jitsu studio

Location

Portslade, UK

}

SIPs Construction time

2 weeks

Materials cost

£23,000 (ex VAT)

This Jiu-Jitsu studio was designed, manufactured and erected by the uSIPs team. It required work within a very tight area, plus a brief to maximise as much as possible of the available space.

We were able to build the structure using our 150mm thick SIP panels, as opposed to 400mm cavity wall methods – saving around 500mm of space internally.

As there were minimal wet trades involved too, the project was extremely cost effective, when compared to traditional building methods.

Take a look at the video which perfectly shows the confines of the space our team had to work with.

 

Commercial school classroom

Location

Sandridge, Hertfordshire

}

Construction time

2 weeks (SIPs and structural)

Materials cost

£18,000 (ex VAT)

Being a school with the all-too-familiar pressures of budgets, we enabled our client to provide a high quality classroom for their students at a cost within their build budget.

The building was designed and then fabricated off-site and finally erected within just two days. The build met all u-Value, structural and fire regulations and is now being used all year round as a music room.

Residential ground floor extension

Location

Enfield, London

}

Construction time

1 week (SIPs and structural)

Materials cost

£6,000 (ex VAT)

This project utilised the many benefits of using SIPs, as opposed to conventional build methods. With a tight plot space, we were able to save internal wall space by providing 150mm walls with pre-fabricated cement board externals.

In addition to this, the client didn’t have to bother the neighbour by having bricklayers enter their space – we were able to build the entire structure on the clients property alone. Further to this, the cost of the build was a fraction of the cost quoted using bricks and mortar.

This client now enjoys their beautiful home extension, which was signed off by building control.